Recently, a majestic twin-tower cable-stayed bridge has appeared on a new stamp issued by the South American country of Guyana: two towering pylons stand above the wide Demerara River, with fan-shaped cable stays reaching into the clouds. The bridge depicted on the stamp is the New Demerara River Bridge (the Bharat Jagdeo–Demerara River Bridge) in Guyana, constructed by China Railway Construction Engineering Group Co., Ltd. (hereinafter referred to as "CRCC International").
A majestic twin-tower cable-stayed bridge has recently appeared on a new set of stamps issued by Guyana, a South American country: two tall towers stand over the wide Demerara River, with fan-shaped stay cables reaching toward the clouds. The bridge on the stamps is the New Demerara River Bridge (Bharat Jagdeo–Demerara River Bridge), built by China Railway Construction International Group Co., Ltd. (hereinafter referred to as “CRCCI”).
Stamps have long been known as a country’s “national name card.” Printing a bridge built by a foreign company on its national stamps represents Guyana’s strong recognition of the project, and once again engraves “China-built” into a country’s historical memory in the most formal way.

Figure 1: The New Demerara River Bridge at sunset (drone photo)
I. Within a Tiny Square: A Chinese Project on a “National Name Card”
In countries around the world, stamps have never been merely proof of postage. Within their tiny frames, they carry a nation’s proudest historical events, cultural symbols, and construction achievements—those that make it onto stamps are often a country’s most representative “national name cards.” The selection of the New Demerara River Bridge for the stamp design means that this bridge, open to traffic for just over a year, has risen from a transport project to a national symbol of Guyana.
In the eyes of Guyanese President Irfaan Ali, the bridge is a “lifeline” for commerce, industry, and people’s daily lives. At the opening ceremony on October 5, 2025, President Ali, Prime Minister Mark Phillips, Vice President Bharrat Jagdeo, and Chinese Ambassador to Guyana Yang Yang jointly cut the ribbon for the bridge; on the river, a fleet of vessels formed a line, sounded their horns, and sailed slowly beneath the new bridge; after nightfall, fireworks bloomed above the bridge towers as people waved national flags and posed for photos on the bridge. Today, the bridge’s magnificent silhouette has been condensed into the tiny space of a stamp, becoming a national image that can be sent around the world.

II. Farewell to a 47-Year-Old Floating Bridge: Guyana’s Most Complex Transport Project in History
Guyana is located in northern South America on the Atlantic coast. In the languages of its Indigenous peoples, its name means “land of many waters,” and the country is crisscrossed by rivers and canals. The capital, Georgetown, sits right at the mouth of the Demerara River; for decades, traffic between the city and areas on the east bank depended entirely on a floating bridge first built in 1978—designed for a service life of only 10 years, it has been in service for more than four decades beyond its intended lifespan.
“Crossing the river during the morning and evening rush hours meant queuing for more than an hour just to get through,” recalled taxi driver Harvey. Even more frustratingly, the floating bridge had to suspend traffic for one to two hours each day to open a navigation channel for vessels to pass. As Guyana’s economy has grown rapidly in recent years, the old floating bridge has increasingly become a bottleneck constraining development.
In May 2022, CRCCI signed a construction contract with Guyana’s Ministry of Public Works; in January 2023, construction of the New Demerara River Bridge officially began. It is Guyana’s largest and most technically complex transport infrastructure project to date: approximately 2,900 meters long, it adopts a twin-tower, double-cable-plane concrete cable-stayed bridge structure, with the main bridge’s cable-stayed span reaching 480 meters; the deck has four lanes in two directions, a design speed of 80 km/h, a design service life of 100 years, and a project investment of about US$262 million.
In June 2025, the two main towers were successively topped out; on August 28, the bridge was joined; on October 5, it officially opened to traffic. Since then, a long rainbow designed to last a century has spanned the Demerara River. River-crossing traffic is no longer constrained by tides or bridge openings for navigation, and average daily capacity has increased severalfold compared with the old floating bridge, making more than four decades of congestion a thing of the past.
III. Building a Bridge at an Equatorial Estuary: A Chinese Solution in the Face of a “Green Hell”
Building the bridge at the mouth of the Demerara River meant that Chinese builders had to confront multiple challenges at once: ultra-deep soft soil at the estuary, a highly corrosive marine environment, a daily tidal range of about 3 meters, and a hot, humid tropical climate with abundant rainfall—waters once described by English explorer Walter Raleigh as a “green hell.”
Faced with soft soil foundations, the construction team drove 120-meter extra-long piles deep into the ground to lay a solid foundation for the project. Faced with the challenges of excessively high fine-particle content in local sand and the high cost of imported sand, project chief engineer Ning Guangwei, inspired by the Ming Dynasty hydraulic engineer Pan Jixun’s concept of “confining water to scour sediment,” led the team to develop a “confining water to separate sand” process, separating medium-coarse sand that met standards from local sand and solving the material bottleneck on site. The bridge’s load standards meet AASHTO specifications; its wind resistance has been verified against wind speeds with a 50-year return period; and special designs were carried out for ship collision resistance, anti-corrosion in the marine environment, and seismic fortification against intensity 8. The tower crowns feature glass curtain walls incorporating elements of Guyana’s maritime culture and also serve a navigational function, making them a new landmark of Georgetown.
The “character” of Guyana’s rainy season also left a deep impression on the builders. In 2025, the most intensive year of construction, Georgetown’s rainy season arrived a month earlier than usual, local precipitation increased by more than 60% compared with the annual norm, and at one point three-quarters of the project’s construction time was accompanied by rain. While ensuring safety and quality, the builders organized construction scientifically and ultimately achieved the opening target on schedule.
IV. A Bridge of Friendship and Development
During construction, the project created more than 2,000 jobs in total, and more than 20 local senior engineers and over 300 skilled workers grew through hands-on engineering practice; the project department held regular “open days,” receiving more than 2,000 visits in total from Guyanese engineers, university students, and primary and secondary school students. Crane operator Rollex Taylor said: “Under the guidance of my Chinese colleagues, I not only learned to operate different machines but also learned to stay precise in various environments.”
From the outset of design, the project put “green construction” first: the approach bridge was routed around the areas with the densest mangroves to minimize ecological disturbance; during construction, water quality and soil testing and dust suppression were maintained, 20 tonnes of waste engine oil were collected centrally, and open-flame operations were strictly prohibited around the protected area. “This is being responsible for the wetlands and wildlife, and for the future,” said Francis, the project’s health, safety, and environment engineer.
“With the bridge open to traffic, this generation and future generations have received a precious gift—more quality time with the people they love,” wrote the Guyana Chronicle. Paul Cheung, president of the Guyana-China Friendship Association, put it more succinctly: “This bridge is a bridge of friendship, a bridge of development, and a bridge to the future.”
Today, CRCCI’s story in Guyana continues: upstream along the Demerara River, construction is accelerating on the New Mackenzie–Wismar Bridge, which connects the two banks of Linden. Once completed, it will cut river-crossing time from an average of 20 minutes to less than 3 minutes. Since China and Guyana established diplomatic relations more than 50 years ago, from airport expansion to hospitals and schools, and from power transmission and transformation projects to river-crossing bridges, batches of Chinese projects are being integrated into the country’s modernization process—and that stamp in its tiny frame is the most vivid footnote to it all.
(This article draws on public reports from Xinhua News Agency, People’s Daily, and the official website of China Railway Construction International Group.)